On this page
Black Sea crude moves mainly on Suezmax and Aframax tankers, and most of it reaches the Mediterranean through the Bosphorus and the Dardanelles. Fixing it well means pricing three things together before the freight is agreed: the Straits transit, the loading terminal's programme and the compliance checks on the cargo. Our crude desk in Istanbul works these cargoes every day.
Which ships trade Black Sea crude?
- Suezmax (130,000–160,000 dwt, about one million barrels). The Baltic Exchange's TD6 route, Black Sea to the Mediterranean, is the reference voyage, and Suezmaxes carry most CPC cargoes.
- Aframax (80,000–115,000 dwt, about 700,000 barrels) for smaller parcels and for ports where a Suezmax does not fit.
Both sizes are fixed spot, on contracts of affreightment (especially for CPC programmes) and on 6–12 month time charters.
What is CPC, and why does it matter to charterers?
CPC is the Caspian Pipeline Consortium. Its pipeline carries crude, mainly from Kazakhstan, to a marine terminal on the Russian Black Sea coast near Novorossiysk, where it loads as CPC Blend at offshore moorings. Three features shape the charter:
- A monthly loading programme. Laycans follow the terminal's programme, and a slip in the programme moves the ship's dates.
- Weather. Offshore moorings stop loading in bad weather, so winter programmes slip more often. How weather time counts towards laytime is worth reading closely; our laytime and demurrage guide shows how.
- Interruptions. The terminal has had interruptions in recent years. Ask the desk for the current status before you commit to dates; our market note on Suezmax demand and CPC volumes gives the background.
How do the Turkish Straits change the estimate?
Tankers of 200 metres and above pass the Bosphorus in daylight, the Turkish Straits Vessel Traffic Service can run traffic one way while the largest ships pass, and storms or fog can stop it altogether. Waiting time varies with ship size, direction and season, and on a short voyage it can be a large share of the ship's time. Every Black Sea estimate we send states:
- the transit waiting days assumed for that ship, direction and month;
- pilotage, tugs and Montreux Convention dues as separate lines;
- how the charter party allocates waiting beyond the allowance.
The Turkish Straits guide explains the rules, and the freight calculator includes Straits passages in a first estimate.
Which charter terms decide the money on a Black Sea fixture?
- Laycan against the programme. A narrow laycan protects the charterer, but only if the terminal can meet it; otherwise it becomes waiting time and a dispute.
- Laytime and weather. Whether time lost to weather at an offshore mooring counts as laytime, and at what demurrage rate, often matters more than a few Worldscale points.
- The Turkish Straits clause. Whether waiting to transit is owners' time, laytime or paid at the demurrage rate.
- Emissions costs. Discharges in EU ports bring EU ETS allowances into the voyage cost, so agree who bears them; see our note on EU ETS cargo allocation.
Which compliance checks apply to Black Sea crude?
Origin decides which sanctions and price-cap rules apply, not the loading port. Before an offer goes out we screen the counterparties and the ship and check the origin documents and, for Russian-origin oil, the price-cap attestations; our note on the price-cap attestation workflow explains the desk process. Parts of the Black Sea are also war-risk areas for the London insurance market, so the additional premium and who pays it need to be agreed in the fixture. Inquiries that fail compliance review are declined; see how we screen.
What should you send the crude desk?
Black Sea order
Grade and origin, quantity and tolerance, load terminal and programme dates, discharge port or range, laycan, preferred terms (spot, COA or period), your charter party form and riders, and the counterparties' legal names. For discharge in Türkiye, the terminal name.
We reply within 60 minutes during business hours with ships, a freight idea in Worldscale and TCE terms, and the Straits and weather assumptions behind it. For cargoes into Turkish refineries, see Turkish ports for tankers and LPG.
This page explains how chartering works in practice. It is not legal advice; the charter party, the current regulations and the terminal's own rules govern any specific fixture.
