On this page
Why do the Turkish Straits matter to a charterer?
The Bosphorus and the Dardanelles are the Black Sea's only sea link to the rest of the world. Crude from Novorossiysk and the CPC terminal, products from Black Sea refineries, and LPG and ammonia into Türkiye and the Med all pass through them. Every Black Sea voyage therefore carries a transit, usually two.
The passage itself takes hours. The waiting can take days. For a Suezmax on the Black Sea–Med run (the TD6 lane) or a small LPG ship on a short Black Sea voyage, the time spent at anchor waiting to transit can decide whether the voyage makes money, so it belongs in the estimate from the start.
Which rules govern a Straits transit?
Under the Montreux Convention, merchant ships have freedom of passage through the Straits in peacetime, whatever their flag or cargo. Türkiye regulates how they pass: traffic separation, reporting, pilotage and the order in which large ships go through are managed by the Turkish Straits VTS under the Straits' maritime traffic regulations.
- Sailing plans: ships report to the VTS before arrival with a first sailing plan (SP-1), normally at least 24 hours ahead and earlier for the largest ships, then confirm with a second report (SP-2) shortly before entering.
- Daylight transits: tankers and ships carrying dangerous cargo of 200 m length overall and above pass the Bosphorus in daylight, which in practice covers every Aframax and larger tanker.
- Large-ship windows: the VTS can hold traffic, or run it in one direction, while the largest and most hazardous ships pass. Northbound and southbound ships therefore queue in turn.
- Pilotage and tugs: pilotage is compulsory for some categories of ship and strongly recommended for all others. Laden tankers almost always take a pilot, and large ones a tug escort.
- Suspensions: the VTS stops or restricts traffic in fog, strong currents and storms, and during incidents. Queues build quickly when it does.

What drives waiting time at the Straits?
Waiting time depends on the size and cargo of the ship, the direction of travel, the weather and the length of the queue of other large ships. A small ship without dangerous cargo may pass with little delay; a laden Suezmax can wait from several hours to several days.
- Season: winter storms and spring and autumn fog cause the longest suspensions.
- Ship size and cargo: the daylight rule and one-way windows limit how many large tankers pass each day.
- Direction: the queue is often longer in one direction than the other, and the pattern changes daily.
- Events: incidents, groundings or security measures can close a strait at short notice.
- Paperwork: Türkiye has at times asked tankers for extra proof of insurance before transit, as in December 2022, which built long queues within days.
What does a Straits transit cost?
There is no toll for passage. Ships that transit without calling at a Turkish port pay only the dues set by the Montreux Convention for lighthouse, health and life-saving services, calculated on the ship's net tonnage. Pilotage, tugs and agency fees are added at the published tariffs when the ship uses them. We price these as separate lines rather than a lump sum, so they can be checked against the agent's account.
Who pays for Straits delays under the charter party?
Who pays for waiting time is a contract question, not a weather question. Tanker charters for Black Sea business often include a specific Turkish Straits clause that sets whether time waiting to transit counts as laytime, is paid at the demurrage rate, or is for owners' account. Read it before you fix: the same delay can be worth very different sums under different wordings.
- Voyage charters: check whether Straits waiting is excluded from laytime, paid as a separate allowance, or treated as part of the voyage.
- Time charters: waiting is normally the charterer's time, so it belongs in the trip estimate and in the hire calculation.
- War risk: calls in listed areas of the Black Sea need additional war-risk cover, and attacks on shipping near the Bosphorus in 2026 have made underwriters stricter. Agree who pays the additional premium and crew bonuses.
- Documents: make sure insurance certificates and any confirmation letters the Turkish authorities may ask for are on board before the ship arrives.
How do we build the Straits into an estimate?
Our Istanbul desk sits on the Bosphorus and follows the Straits every day. Every Black Sea freight idea we send states the transit waiting days we have assumed for that ship, direction and season, together with the transit costs and the clause that allocates them. If the queue changes before you fix, we tell you and re-price.
This guide summarises how transits work in practice. It is not legal advice; the current regulations, VTS instructions and the ship's agent are the authority for any specific transit.

